Skip to content
SBA Civil Logo
  • Home
  • About
    • Meet Our Team
    • GroundWork
    • Blog
  • Awards
    • Approvals & Accreditations
    • News
  • SERVICES
    • Drainage and Service Installation
    • Earthworks, Erosion & Sediment Control, and Retaining Walls
    • Land Development & Subdivision
    • Local Council & State Highway Maintenance
    • Machine Hire
  • Gallery
  • Testimonials
  • Projects
  • Contact us

Blog

Blogsbacivil_admin2026-05-07T12:36:14+00:00
  • Kerb and Footpath Repairs: What Are Councils Responsible For?
    Gallery

    Kerb and Footpath Repairs: What Are Councils Responsible For?

    sbacivil_admin-December 17th, 2025-

    Local councils generally manage public footpaths and kerbs within road reserves, including inspections, repairs, cleaning and renewal programmes. Property owners may remain responsible for vehicle crossings, driveway areas, berm maintenance

  • How Retaining Walls Are Engineered to Handle Load, Water & Slope
    Gallery

    How Retaining Walls Are Engineered to Handle Load, Water & Slope

    sbacivil_admin-December 9th, 2025-

    Retaining walls are engineered to manage soil pressure, water movement and changing ground levels. Their design considers site conditions, wall height, drainage, foundation stability and surrounding loads. Proper engineering helps

  • 5 Key Challenges of Land Development in the Wellington Region
    Gallery

    5 Key Challenges of Land Development in the Wellington Region

    sbacivil_admin-November 26th, 2025-

    Land development in Wellington involves steep terrain, unstable ground, infrastructure coordination, complex consent requirements, cost pressures, delays, and environmental concerns. Successful projects benefit from early site investigations, coordinated services, staged

  • Drainage Solutions for Hilly or Sloping Sites
    Gallery

    Drainage Solutions for Hilly or Sloping Sites

    sbacivil_admin-November 24th, 2025-

    Drainage on sloping sites requires careful surveying, geotechnical assessment, flow management and regulatory planning. Solutions include contour drains, swales, riprap, gabions, French drains, retaining wall drainage, drop pipes, culverts

  • Drainage Challenges Impacting Civil and Industrial Sites in Wellington
    Gallery

    Drainage Challenges Impacting Civil and Industrial Sites in Wellington

    sbacivil_admin-October 22nd, 2025-

    Wellington civil and industrial projects can face waterlogging, undersized stormwater systems, blocked drains, poor outlets, material failures and difficult ground conditions. Effective solutions include early drainage planning, hydraulic modelling, sediment

Previous12

SBA CIVIL
GREATER WELLINGTON REGION & BEYOND
[email protected]
04 212 7614

Page load link
Business Central Oct 2025 feature_jpeg

GWRC Bus Terminal – Naylor Love

Location: Wellington Airport precinct 
Client: Naylor Love 
Date: August 2025 – March 2026

Overview:  SBA Civil delivered bulk earthworks, building platform preparation, and full civil infrastructure works for the GWRC Electrical Bus Depot within a tightly constrained site adjacent to Wellington Airport. 

Scope of Works: 

  • Bulk earthworks and building platform construction across an approximately 5,000m² site
  • Installation of complex deep services (approx. 3,000m), including stormwater, sewer, and firewater ring mains with dewatering
  • Subgrade preparation, pavement construction, and cement-stabilised basecourse
  • Asphalt surfacing and final civil finishes

Outcome: SBA Civil successfully delivered and closed out the project for principal contractor Naylor Love, demonstrating capability in complex civil construction, deep services, and infrastructure delivery within constrained operational environments. 

Business Central Oct 2025 feature_jpeg
Go to Top