Projects
NZTA Transmission Gully
End-to-end civil construction delivered with efficiency and control
Huiawa Subdivision – Waikanae
Civil infrastructure delivered with precision on the Kāpiti Coast.
Hill Road Slip Repair – Paekākāriki
Civil works delivered on the Kāpiti Coast with proven local expertise
Summerset Development – Levin
Civil works delivered efficiently using modern plant and experienced crews
Project Compilation – Wellington Region
Groundworks delivered efficiently to support project success
Raiha St Subdivision
Civil works delivered in Porirua
Year in Review – Wellington Region
Civil works executed with the right equipment, expertise, and control
PREVIOUS PROJECTS
GWRC Bus Terminal – Naylor Love
Location: Wellington Airport precinct
Client: Naylor Love
Date: August 2025 – March 2026
Overview: SBA Civil delivered bulk earthworks, building platform preparation, and full civil infrastructure works for the GWRC Electrical Bus Depot within a tightly constrained site adjacent to Wellington Airport.
Scope of Works:
- Bulk earthworks and building platform construction across an approximately 5,000m² site
- Installation of complex deep services (approx. 3,000m), including stormwater, sewer, and firewater ring mains with dewatering
- Subgrade preparation, pavement construction, and cement-stabilised basecourse
- Asphalt surfacing and final civil finishes
Outcome: SBA Civil successfully delivered and closed out the project for principal contractor Naylor Love, demonstrating capability in complex civil construction, deep services, and infrastructure delivery within constrained operational environments.
Raiha Street Development
Location: Porirua
Client: Private Developer
Date: October 2025 – February 2026
Overview: SBA Civil delivered the full civil works package for a new commercial development at Raiha Street, including erosion and sediment control, drainage, earthworks, retaining structures, service infrastructure, and site roading.
Scope of Works:
- Earthworks cut-to-fill of approximately 5,000m³
- Installation of a 200m³ stormwater attenuation tank
- Construction of drainage, retaining walls, and common service trenches
- Site preparation and roading for commercial development
- Precision site preparation to ±10mm tolerance for a 200mm reinforced concrete slab across the building platform
Outcome: The project was completed within a tight programme and to high construction tolerances, demonstrating SBA Civil's capability to deliver technically demanding civil works for commercial developments.
NZTA Subsoil Drainage – Ventia
Location: State Highway 1
Client: Ventia (for NZTA)
Date: October 2025 – January 2026
Overview: SBA Civil was engaged to deliver an accelerated subsoil drainage installation within live traffic conditions on State Highway 1, requiring precise staging, continuous operations, and rigorous safety management.
Scope of Works:
- Installation of approximately 4,500 metres of inground subsoil drainage
- Delivery across two work fronts averaging around 400 metres per day
- Traffic staging and management to maintain live highway operations
- Four full road-closure weekends to complete critical road crossings
Challenges & Approach: Works were undertaken under an intensive seven-day programme, operating split shifts of 15–16 hours per day over a four-week peak delivery period. Detailed planning and disciplined traffic management ensured safety and minimal disruption to the travelling public.
Outcome: The drainage works were completed efficiently within the accelerated timeframe, demonstrating SBA Civil's capability to deliver high-volume infrastructure works safely within live state highway environments.
Huiawa Street Subdivision
Location: Waikanae
Client: Private Developer
Date: July 2025 – December 2025
Description: SBA Civil was engaged to deliver the full civil works package for a 14-lot residential subdivision, including drainage, earthworks, retaining structures, pump station installation, common service trenches, and roading.
Scope of Works:
- Bulk earthworks and import of approximately 5,000m³ of sand
- Installation of a 5.5-metre-deep sewer pump station in high groundwater conditions
- Construction of drainage, retaining walls, and service infrastructure
- Formation of subdivision roading and accessways
- Full project management, design coordination, and council liaison
Outcome: The subdivision civil works were completed successfully, demonstrating SBA Civil's capability to manage complex ground conditions, deep infrastructure installation, and end-to-end project delivery for residential developments.
ECO Reef Retaining Wall
Dates: August 2025
Description: SBA Civil delivered this emergency works contract for Porirua City Council to repair a compromised roadside retaining wall affected by stream erosion, which had created a vertical face of approximately 3.5 metres at the road shoulder.
The scope included full traffic management—maintaining 24-hour stop/go operations under traffic light control—alongside the design and installation of an ECO Reef retaining wall. All works were successfully completed within a three-week timeframe despite challenging winter conditions and two significant weather events.
The project was delivered safely, efficiently, and to a high standard, resulting in a positive outcome for the client and demonstrating SBA Civil's capability in rapid-response infrastructure works.
MERCK SHARP & DOHME (MSD) – VACCINE CENTRE UPGRADE
Dates: October 2022 to May 2025
Description: SBA Civil performed all civil disciplines on the project including stormwater, sewer, firewater ring mains, subgrade and pavement construction, asphalt, and ITS installation whilst working on a fully operational vaccine plant. SBA Civil was the contractor of choice and we closed the Project out for the principal Worley.
SUBDIVISION – SUMMERSET BY THE RANGES, LEVIN
Dates: June 2024 to January 2025
Description: SBA Civil was engaged to carry out and civil works including drainage, earthworks and roading for an expansion of the retirement village, performing erosion and sediment controls installation and roading alterations, constructing new building platforms and install all associated common services trenching work.
- This project covered an area of 7,400m2, consisting of 540m of trenched services, 23 manholes/sumps, an asphalt carriageway of 970m2, with 450m of new kerbs, and over 1,000T of unsuitable material removed from site.
- SBA Civil obtained Winter Works Approval within 2 weeks of contract award to allow the project to meet program constraints. Summerset have given glowing accolades of SBA Civil for this project.
TRANSMISSION GULLY – CPBHEB
Dates: April 2020 to January 2025
Description: SBA Civil performed all civil disciplines on the project including earthworks, drainage, foundation improvements, subgrade and pavement construction, ITS installation, high-risk slip repair and remediation, bulk watermain installation.
NEW FUEL LINE – Z-FUEL
Dates: Nov 2023 to April 2024
Description: SBA Civil performed all associated civil works for a new fuel line on behalf of Z-Fuel, works included trenching, sheet piling, service installation, concrete works incl. fuel station slab, pavement installation, temporary service support, traffic management and all whilst working under stringent terminal regulations.
This job was a huge success, ahead of baseline program and on budget. This was a very challenging job working around the live fuel line that had ship discharges on a weekly basis.
200MM FIREWATER RING MAIN COUNCIL CONNECTION
Dates: Feb 2024
Description: SBA Civil performed Bulk Firewater ring main connection for our Whakaitiki Jobsite. This involved a full street shutdown (100 homes and businesses) and connection of a 200mm ductile iron main. This was another successful project completed as a Wellington Water approved subcontractor under Wellington Pipelines.
180 BULK WATERMAIN INSTALLATION – KAPITI COAST DISTRICT COUNCIL
Dates: May 2023 to July 2023
Description: SBA Civil was contracted to install, commission and liven the bulk watermain connection from Paekakariki to Bridge 2. This involved the installation of 950m 180PE using fusion couplers, valves, fire hydrants, shallow culvert crossings, traffic management implementation and coordination, livening and commissioning and chlorination plans.
EMERGENCY EMBANKMENT SLIP REPAIRS – PORIRUA CITY COUNCIL
Dates: Feb 2023 to April 2023
Description: SBA Civil performed detailed earthworks in a very difficult site, performing erosion and sediment controls installation, box out of unsuitable material and embankment reconstruction all under tight traffic management constraints.
EMERGENCY SLIP REPAIRS – PUKERUA BAY TO PLIMMERTON – KIWIRAIL
Dates: November 2022 to March 2023
Description: SBA Civil performed emergency slip repairs on high-risk slopes in rail corridor shut downs. This project was very high risk, required highly skilled operators and supervision for planning and execution and a huge program push to ensure all slip repairs were repaired and remediation in the designated shutdowns. On top of the emergency works SBA Civil completed access track upgrades, barrier installation and erosion sediment control implementation.
CALLAGHAN INNOVATION SERVICE UPGRADE – WELLINGTON PIPELINES
Dates: July 2022 to Feb 2023
Description: SBA Civil performed all in-ground services including drainage, sewer and ITS. Main service installation was HV ducts (1,266m) and Comm’s ducting (3,497m) along with 180mm riser main (500m) including gate valves, hydrants, bends, etc.
STREAM REMEDIATION – WELLINGTON WATER
Dates: Feb 2023
Description: SBA Civil performed the remediation and protection of an exposed main sewer line in Johnsonville. This involved temporary diverting the stream, construction of a new fill embankment and rip rap armouring protection, all whilst working on top of an existing sewer line.
STORMWATER RETENTION TANK
Dates: Feb 2023
Description: SBA Civil performed the installation of two sub ground retention storage devices that were designed to sit 450mm below finished road surface. This was a challenging job with high water table levels and a spear dewatering required to allow subgrade compliance and base course installation before the module install.
CONCRETE DRAINS AND SCOUR PROTECTION – CPBHEB
Dates: Dec 2023 – Current
Description: SBA Civil has performed multiple water channel drains including all excavation, preparation, concreting and finishing. Generally, these concrete drains are in tight and difficult locations making the job a lot harder than it should be, meaning nightshift and weekend works are required around traffic constraints.
VARIOUS FINISHING WORKS – ALL CLIENTS
Dates: 2023 – Current
Description: SBA Civil prides itself on all round capability for a job lifespan, from underground services to finishing works (kerb and channel) and pavement preparation/ installation. We have the capability and have performed large amount of details and also road construction.
MIRIMAR SCHOOL BUS TERMINAL – FULTON HOGAN
Dates: June 2022 to October 2022
Description: SBA Civil performed detailed earthworks, all in-ground services including drainage, sewer and ITS. On top of the inground services we installed two SPEL interceptor units and large-scale attenuation tanks.
SUBDIVISION – ORIEL DEVELOPMENTS
Dates: April 2022 to June 2022
Description: SBA Civil performed detailed earthworks in a very difficult site, performing erosion and sediment controls installation and stream diversion works whilst mucking out a gully, constructing a new building platform and install all associated drainage work.
PREVIOUS PROJECTS
GWRC Bus Terminal – Naylor Love
Date: August 2025 – ongoing
Raiha Street Development
Date: October 2025 – February 2026
NZTA Subsoil Drainage – Ventia
Date: October 2025 – January 2026
Huiawa Street Subdivision
Date: July 2025 – December 2025
ECO Reef Retaining Wall
Date: August 2025
MERCK SHARP & DOHME (MSD) – VACCINE CENTRE UPGRADE
Date: October 2022 to May 2025
SUBDIVISION – SUMMERSET BY THE RANGES, LEVIN
Date: June 2024 to January 2025
TRANSMISSION GULLY – CPBHEB
Date: April 2020 to January 2025
NEW FUEL LINE – Z-FUEL
Date: Nov 2023 to April 2024
200MM FIREWATER RING MAIN COUNCIL CONNECTION
Date: Feb 2024
180 BULK WATERMAIN INSTALLATION – KAPITI COAST DISTRICT COUNCIL
Date: May 2023 to July 2023
EMERGENCY EMBANKMENT SLIP REPAIRS – PORIRUA CITY COUNCIL
Date: Feb 2023 to April 2023
EMERGENCY SLIP REPAIRS – PUKERUA BAY TO PLIMMERTON – KIWIRAIL
Date: November 2022 to March 2023
CALLAGHAN INNOVATION SERVICE UPGRADE – WELLINGTON PIPELINES
Date: July 2022 to Feb 2023
STREAM REMEDIATION – WELLINGTON WATER
Date: Feb 2023
STORMWATER RETENTION TANK
Date: Feb 2023
CONCRETE DRAINS AND SCOUR PROTECTION – CPBHEB
Date: Dec 2023 – Current
VARIOUS FINISHING WORKS – ALL CLIENTS
Date: 2023 – Current
MIRIMAR SCHOOL BUS TERMINAL – FULTON HOGAN
Date: June 2022 to October 2022
SUBDIVISION – ORIEL DEVELOPMENTS
Date: April 2022 to June 2022