STORMWATER RETENTION TANK
Feb 2023

Description: SBA Civil performed the installation of two sub ground retention storage devices that were designed to sit 450mm below finished road surface. This was a challenging job with high water table levels and a spear dewatering required to allow subgrade compliance and base course installation before the module install.